Technology Infrastructure Relocation Services
As part of Physical Relocation, we professionally handle the secure dismantling, transportation, and reinstallation of hardware such as servers, storage units, and switches, along with electrical infrastructure setup and rack organization.

Seamless Transition
Smooth Relocation
We relocate your data center infrastructure to a new location in a planned and controlled manner, ensuring business continuity at every stage through backup, testing, and migration checks. We professionally manage every step to bring your systems back online smoothly and efficiently.
Migrate Your Virtual Infrastructure with Confidence, Maintain Your Performance
We migrate your virtual machines on VMware, Hyper-V, Proxmox, and other platforms while minimizing the risk of downtime. Whether transitioning to cloud, hybrid, or on-premise systems, we manage the entire process in a planned and secure manner to ensure i

Network and System Configuration\
Aligned with the New Environment
During the transition process, we reconfigure IP planning, DNS, access policies, and security settings to align with the new environment. At the end of the process, we perform system tests and post-migration checks to ensure your infrastructure operates smoothly.
Discovery and Preliminary Analysis
The migration process begins with a thorough inventory of the existing infrastructure. At this stage, the criticality of the systems to be moved and their interdependencies are analyzed to ensure accurate prioritization.
Planning
Taşımanın tarihleri, sistem kesinti süreleri ve olası geri dönüş senaryoları net şekilde belirlenir. Donanım, yazılım, bağlantılar ve erişim ihtiyaçları göz önünde bulundurularak kapsamlı bir taşıma planı hazırlanır.
Backup and Pre-Migration Preparation
Up-to-date backups of all systems to be migrated are created to eliminate the risk of data loss. When necessary, migration scenarios are executed in a test environment to ensure thorough preparation for the process.
Migration and Installation
Hardware components are safely dismantled, transported to the new location, and reinstalled. Virtual machines are transferred to the new environment either through live migration or planned cold move, depending on the scenario.
Configuration and Testing
Systems are powered on, network connections are established, and service checks are performed. Access, security, and performance tests are then conducted to verify that all systems are operating smoothly.
Go-Live (Deployment)
Systems are brought live and tested in collaboration with end users. The entire process is documented and reported, and the final delivery is made to the customer in a complete and thorough manner.